Turner's Home Page Turner's Product Line Delta-Star Switches Engineering Center Typical Specifications Installation Help
Customer Service Site Search Contacts
OperatorsPhase-Over-PhaseVertical Break InterruptersCenter Break
Installation Help
 

TECO-RUPTOR VACUUM INTERRUPTER

View Online

  • Receiving & Storing
  • Installation
  • Operation

    Download File

  • Download PDF File
  • These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met in connection with installation, operation or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser's purposes, the matter should be referred direct to the Turner Electric, LLC factory at 1-618-397-1865.

    RECEIVING AND STORING RECEIVING:

    Customer should check material against packing list (attached to crate in waterproof package) upon receipt, to be sure all parts have been received. If crated switch box or vacuum interrupter box is damaged, material should be checked against Bill of Material for broken or missing components.

    If possibility of damage exists, remove the interrupter and:

    STORING:

    Vacuum interrupters are fragile and must be handled with care. Live parts must not be subjected to rough handling.

    INSTALLATION:

    OPERATION:

    OPENING:

    CLOSING:

    Products Delta-Star Switches Engineering Center Typical Specifications Installation Help Customer Service Site Search Contacts

    ©2001-06 Turner Electric, LLC. : Last updated: Nov 05