Turner's Home Page Turner's Product Line Delta-Star Switches Engineering Center Typical Specifications Installation Help
Customer Service Site Search Contacts
OperatorsPhase-Over-PhaseVertical Break InterruptersCenter Break
Installation Help
 

TYPE TCV2 CENTER BREAK SWITCHES

View Online

  • Receiving & Storing
  • Installation
  • Maintenance
  • Operation
  • Inspection

    Download File

  • Download PDF File
  • These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met in connection with installation, operation or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred direct to the Turner Electric, LLC factory at 618-397-1865.

    RECEIVING & STORING

    RECEIVING:

    Each group operated center side break "V" type switch consists of separately packaged items - (1) crated switch units with insulators installed including fasteners and control parts. (2) banded operating and interphase pipe, and (3) crated vacuum-interrupters (if required), and special mounting steel when needed. Customer should check material against packing list (attached to crate in waterproof package) upon receipt, to be sure all parts have been received. If crated switch box or vacuum interrupter box is damaged, material should be checked against Bill of Material for broken or missing components. If switches indicate possibility of damage, remove the interrupter and:

    STORING:

    A reasonable amount of care should be taken when handling and storing air-break switches. Porcelain insulators and vacuum interrupters are fragile and must be handled with care. The live parts must not be subjected to rough handling.

    Air-break switches are outdoor devices, and may be stored indoors or outdoors, however, it is advisable to protect all moisture absorbing cartons, such as cardboard, if they are to be stored for a long period of time. All parts should be left in crates or packaging until time of assembly.

    Plastic envelope located inside switch crate contains instruction book, control and switch outline drawings. These should e removed from the switch prior to installation.